PLATEN VACUUM
Make sure the vacuum gauge reads -15Hg or higher (more negative) before building or calibrating. See Troubleshooting:Low Vacuum if gauge is out of range.

USING BUILD SHEETS
Use clear build sheet for ABS-M30, PC, and PC-ABS.Use amber build sheet for PPSF and ULTEM.Use green tinted build sheet for Nylon 12.

INSTALLING CANISTERS
Remove the anti-rotation plug from side of canister before use. Seal hole with sealing tape.Make sure the rubber shipping insert is removed from the thumbwheel door before building. Do not remove rubber shipping insert until the canister is loaded into the canister bay.

Read more

Did this answer your question?